ProdTech
keys 2
Global Ai integrator
1. AR-modeling of space
Technologies used:
Mobile development, ARKit
Task:
Augmented reality in the city: demonstration of new buildings, events, reconstruction, tourist sites, historical events
Solution:
Platforms for AR presentations based on the platform for the presentation of construction objects
Result:
An increase in the tourist flow through the main places of the city by 20%, gamification, an additional advertising channel for business
2. Presentation of construction projects
Technologies used:
Biometric scanner based on facial and voice identification
Task:
Create a catalog of 3D buildings projects
Solution:
Using and writing mobile application libraries to host 3D-models
Creating a mobile application
Transfer of 3D-projects of buildings to the catalog of the mobile application
Result:
An application that allows builders to demonstrate an object without a stand
The opportunity for the client to walk around the building with a mobile device in his hands, before the start of its construction
The ability to evaluate the finished result by projecting it on the building site https://www.youtube.com/watch?v=pMFFotXU3So
3. Contractor and equipment control service
Task:
The procedure for selecting and verifying a contractor takes up to two months on average. The lack of a transparent history of the drilling contractor's work leads to downtime of the oil production work performed
Solution:
A database based on a distributed registry that does not allow changing information in the system unnoticeably (a separate platform for conducting tenders for drilling operations, a data sheet of equipment or integration with an existing solution)
Result:
Reduction in the number of accidents associated with the breakthrough of drill pipes
Prompt and reliable monitoring of the quality of purchased services.
Equipment failures during work due to confusion/forgery of documents on technical characteristics of the equipment
The existing methods of rapid evaluation of drill pipe operating time are inaccurate: the operating time is calculated generically and distributed immediately to the entire set of about 1000 units, without detailing to each pipe separately
4. Interface for predictive markup of photo power lines
Task:
Increasing consumer requirements for the reliability of power supply against the background of a continuing increase in physical wear of all overhead line elements. Today it is necessary to react more quickly both to incipient defects and violations of the operating conditions of overhead lines, and to eliminate malfunctions that caused emergency shutdowns.
Result:
Elimination of power shortage
Reduction of labor costs by reducing/eliminating crawlers
Solution:
Step 1. Detection (A retina net-based detector is used, with which we will find objects such as wires, supports, garlands of insulators, vibration dampers)
Step 2. Classification (Detected objects (for example, a garland of insulators) are classified using the EfficientNet neural network: whether all insulators are in the garland or not)
Step 3 The result (malfunction highlighted in red, no problems highlighted in green)
Fuel and lubricants economy
Increase in the percentage of power transmission lines diagnosed in time
Ready to start something great?